Home / Services / Solar panels

All of Belgium

Solar panels installed anywhere in Belgium

Roof study, installation, inverter and cabling right into the board, with inspection and registration with the grid operator. On a house, an industrial roof or a ground-mounted array. We rarely install solar on its own: the gain is in what you do with that power.

What the installation includes.

Since the Belgian net-metering scheme ended, what counts most is how much of your own generation you use yourself. That is why we look at your consumption profile first and only then at the number of panels.

  • Roof study. Orientation, pitch, shading and load capacity, with a realistic annual yield calculation.
  • Panels and mounting. On tiles, slate, a flat roof or a steel roof, with the matching mounting system.
  • Inverter. Sized for the roof and for what you may add later, not chosen tight to make the quote look good.
  • Optimisers where needed. Only with shading or several roof planes, because otherwise it is wasted money.
  • Cabling and board. Right into the distribution board, with the necessary protection and a separate circuit.
  • Inspection and registration. We arrange the inspection of the installation and the registration with the grid operator.
  • Ready for expansion. Space and cable already provided for a battery or a charging point.
  • Monitoring. You see day by day what is generated and what you use yourself.
Honest about returns. An installation that mostly exports to the grid pays back slowly. We calculate with your actual consumption and we say so when a smaller roof or a phased approach makes more sense.
SolarEdge inverter next to the meter cabinet and distribution board, installed by Electrifusion
Inverter, meter and distribution board side by side, neatly wired

From roof study to registration.

Consumption and roofCalculate first

We look at your annual consumption and your daily pattern, measure the roof and work out what you will realistically use yourself.

QuoteFixed price

Panels, inverter, mounting, cabling, inspection and registration in one price. With the expected yield and the payback period.

InstallationUsually one to two days

The owner is on the roof himself and follows the installation from start to finish. On larger roofs we plan in phases so your operation keeps running.

Inspection and paperworkWe arrange it

Inspection of the installation, registration with the grid operator and the documents for your file.

Frequently asked questions about solar panels

That follows from your annual consumption and from when you consume, not from the size of your roof. A household at home during the day gets more out of the same installation than one that only comes back in the evening. We work it out for you before you sign.

Often yes, but not always. A battery pays back when you export a lot and consume a lot in the evening, or when you want to flatten your peak demand. With a small consumption the investment does not stack up. We calculate both scenarios.

Yes. A solar installation takes one to a few days, so travel does not weigh heavily. It is included in the quote. For electrical work and home automation we do stay within 50 km of Vilvoorde.

We arrange both. The installation is inspected by an accredited body and registered with your grid operator. You receive the inspection report and confirmation of the registration.

Then we do not install. Panels on a roof that is due for replacement within ten years cost you money twice. We say so during the site visit if we see it.

Curious what your roof would actually yield?

Send us your annual consumption and we will work it out before anyone comes round.

Ask for a calculation